您当前的位置:
首页 >
文章列表页 >
Allocation analysis of induced draft fans for coal-fired power plants with large capacity
更新时间:2025-09-28
    • Allocation analysis of induced draft fans for coal-fired power plants with large capacity

    • Thermal Power Generation   Vol. 42, Issue 8, Pages: 116-118(2013)
    • CLC: TK223.26
    • Published:2013

    移动端阅览

  • SONG Jingming, GONG Shuhong State Nuclear Electric Power Planning Design & Research Institute. Allocation analysis of induced draft fans for coal-fired power plants with large capacity[J]. Thermal power generation, 2013, 42(8): 116-118. DOI:

  •  
  •  

0

Views

58

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

THE FEASIBILITY OF DRIVING INDUCED DRAFT FAN USING STEAM TURBINE FOR 1000 MW ULTRA-SUPERCRITICAL UNIT
WATER-LEVEL CONTROL IN ULTRA-SUPERCRITICAL ONCE-THROUGH BOILER OF 1000 MW UNIT
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
DETECTION OF MATERIAL DEFECTS IN P92 STEEL MAIN STEAM PIPELINE OF ULTRA-SUPERCRITICAL UNIT
COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS

Related Author

MA Xiaolong
LIU Chao Xi'an Thermal Power Research Institute Co Ltd
WU Yan-binHudian Zhouxian Power Plant
WANG Xin-ge
LI Hong-tao
LIANG Mao-chun Huadian Zouxian Power Plant
HOU Zhao-tang1
CAI Hui1

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huadian Zouxian Power Plant
Huaneng Yuhuan Power Plant
Shandong Electric Power Research Institute
Dongfang Boiler (Group) Co., Ltd
0