您当前的位置:
首页 >
文章列表页 >
Optimization of start and stop of coal mills during once through boiler's fast load varying
更新时间:2025-09-28
    • Optimization of start and stop of coal mills during once through boiler's fast load varying

    • Thermal Power Generation   Vol. 42, Issue 9, Pages: 10-15(2013)
    • CLC: TK223.25
    • Published:2013

    移动端阅览

  • FANG Yanjun, HE Yao, QIN Xiaojie. Optimization of start and stop of coal mills during once through boiler's fast load varying[J]. Thermal power generation, 2013, 42(9): 10-15. DOI:

  •  
  •  

0

Views

194

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of Smith predictor on mill outlet temperature control for a 1000MW unit
Optimization of bed pressure and its upper pressure difference for a 300 MW CFB boiler
Universal calculation model for pulverizing system of utility boilers and its software development
Retrofitting for burning Zhundong coal for a 480t/h boiler
Application of fractional-order model in power plant control systems

Related Author

TAN Wenlin Guangzhou Yueneng Electric Power Technology Development Co.
TAN Zhiqian
KUANG Wei
GOU Jianbing
WANG Zhiwei
WENG Jianming
YUAN Jie
PENG Zhong

Related Institution

Guangzhou Yueneng Electric Power Technology Development Co., Ltd
Sichuan Electric Power Industry Adjustment and Testing Institute
Sichuan Neijiang Gaoba Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Sichuan Baima Circulating Fluidized Bed Demonstration Power Station Co., Ltd
0