Reason analysis for the fifth stage blade fracture in low pressure cylinder of a 600MW unit steam turbine
|更新时间:2025-09-28
|
Reason analysis for the fifth stage blade fracture in low pressure cylinder of a 600MW unit steam turbine
Thermal Power GenerationVol. 42, Issue 11, Pages: 130-133(2013)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TK268;TK263.3
Published:2013
稿件说明:
移动端阅览
ZHANG Yonghai, XIAO Junfeng, GU Weiwei, et al. Reason analysis for the fifth stage blade fracture in low pressure cylinder of a 600MW unit steam turbine[J]. Thermal power generation, 2013, 42(11): 130-133.
DOI:
ZHANG Yonghai, XIAO Junfeng, GU Weiwei, et al. Reason analysis for the fifth stage blade fracture in low pressure cylinder of a 600MW unit steam turbine[J]. Thermal power generation, 2013, 42(11): 130-133.DOI:
Reason analysis for the fifth stage blade fracture in low pressure cylinder of a 600MW unit steam turbine
摘要
对某亚临界600MW机组汽轮机低压第5级断裂动叶片进行了材料理化检验和断口分析
并采用有限元方法对叶片离心应力和轮系振动特性进行了计算。综合分析表明:叶片为高周疲劳断裂
其主要原因为在工作状态下轮系的1阶8节径振动频率落入了"三重点"共振区。
Abstract
Particular investigations on the failure site
operation files and history data of a 600MW unit steam turbine were performed.The material physical and chemical tests and fracture analysis for the fifth stage blade in low pressure cylinder were implemented.The finite element method(FEM)was employed to analyze the blade centrifugal stress and the vibration characteristics of the blade disk system.The results showed that
the first order vibration frequency of the blade disk system under the eighth nodal diameter fell into the "triple coincidence criterion" resonance region was considered as the critical reason for the blade high cycle fatigue failure
ULTRASONIC TESTING METHOD AND ITS APPLICATION FOR LAST-STAGE LONG BLADES IN HEAVY-DUTY STEAM TURBINE
ANALYSIS OF ABNORMAL AXIAL DISPLACEMENT IN STEAM TURBINE OF 600 MW UNIT MADE BY ALSTOM CORPORATION AND HANDLING THEREOF
CAUSE ANALYSIS OF IMPELLER FRACTURE FOR SLURRY-RECIRCULATING PUMPS IN SHANWEI POWER PLANT
STUDY ON AND COUNTERMEASURES FOR ERRORS APPEARED IN MEASUREMENT OF DIFFERENTIAL EXPANSION IN LOW-PRESSRUE CYLINDER FOR 600 MW STEAM TURBINE MANUFACTURED BY ALSTOM
ANALYSIS OF LVDT FAILURE FOR GOVENOR VALVE OF STEAM TURBINE EQUIPPED FOR SUBCRITICAL 600 MW UNIT AND RETROFIT THEREOF