HUANG Hui, LUO Kai, LIU Gang. Parameters control of boiler in FCB test for a 125 MW coal-fired power unit[J]. Thermal power generation, 2013, 42(10): 107-110.DOI:
Parameters control of boiler in FCB test for a 125 MW coal-fired power unit
Combining with the FCB tests under 50% and 100%load conditions of the newly built 2×125 MW unit in Jeneponto
Indonesia
suggestions on opening degree of high/low pressure bypass control valves during fast opening and control strategy for the boiler during quick fuel amount decreasing were put forward
on the basis of several parameters' change
such as the main/reheat steam pressure and temperature
feedwater flow and furnace pressure.Then
according to variation of the main steam pressure and temperature
the opening degree of the high/low pressure bypass control valves was gradually reduced to keep the main steam pressure and temperature within a reasonable range.