您当前的位置:
首页 >
文章列表页 >
Reconstruction scheme for denitrification of boilers equipped with tube type air preheater
更新时间:2025-09-28
    • Reconstruction scheme for denitrification of boilers equipped with tube type air preheater

    • Thermal Power Generation   Vol. 42, Issue 11, Pages: 167-168(2013)
    • CLC: TK223.34
    • Published:2013

    移动端阅览

  • DUAN Yuyan. Reconstruction scheme for denitrification of boilers equipped with tube type air preheater[J]. Thermal power generation, 2013, 42(11): 167-168. DOI:

  •  
  •  

0

Views

104

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation and experimental study of ammonia-coal co-firing in a 4 MW boiler
AIR PREHEATER BLOCKING IN BOILER WITH SCR DENITRIFICATION DEVICE:REASON ANALYSIS AND SOLUTIONS
INFLUENCE OF NITRIFICATION SYSTEM MODIFICATION ON BOILER OPERATION
Formation mechanism and influencing factors of ammonium bisulfate during the selective catalytic reduction process
Experimental study on SNCR process of the effect of CO additive on denitration performance

Related Author

MA Zhaoyao
ZHANG Xiangyu
WEN Hainan
LIU Wen
WANG Zhichao
YU Bo
ZHONG Lijin1
SONG Yubao2 1.Zhuhai Power Station of Guangdong Yudean Group Co.

Related Institution

华能(天津)煤气化发电有限公司
中国矿业大学低碳能源与动力工程学院
西安热工研究院有限公司
Suzhou Huarui Nengtai Power Generation Technology Co., Ltd
Guangdong Electric Zhuhai Power Plant
0