Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass
|更新时间:2025-09-28
|
Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass
Thermal Power GenerationVol. 42, Issue 11, Pages: 164-166(2013)
作者机构:
广东红海湾发电有限公司
作者简介:
基金信息:
DOI:
CLC:X773
Published:2013
稿件说明:
移动端阅览
CHEN Yongcheng. Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass[J]. Thermal power generation, 2013, 42(11): 164-166.
DOI:
CHEN Yongcheng. Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass[J]. Thermal power generation, 2013, 42(11): 164-166.DOI:
Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass
According to the desulfurization system that retained an independent booster fan and added bypass blocking plates
optimizations like increasing four desulfurization system failures to trip boiler in the unit protection control logic were conducted.On the basis of the RB test results
the feed forward control and its coefficient of the blade control strategy for the booster fan under normal condition and fault condition were improved.The RB test results showed that
by the improved control strategy of booster fan blade under the RB conditions
the variation of the booster fan inlet pressure was 1 309Pa
which was significantly decreased compared to that before the improvement(2 065Pa).
OPERATIONAL CHARACTORS OF BOILERS EQUIPPED FOR ULTRA-SUPERCRITICAL 660 MW UNIT AFTER COMBINING THE BOOSTER AIR FAN IN DESULPHURIZATION SYSTEM AND THE INDUCED DRAFT FAN INTO ONE
COMPARISON BETWEEN TWO TYPES OF STEAM TURBINE FOR ULTRA-SUPERCRITICAL 660MW UNITS
Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof
Type selection of pulverizing system under conditions of high altitude and low pressure
Control system design of single row configuration scheme of main auxiliary system in a 660MW unit
Related Author
CHEN Xing
ZHOU Liguo Datang Xinyang Hua'yu Power Generation Co Ltd
HU Kun
MA XuesongGuangdong Electric Power Design Institute
LI Ke1
ZHANG Chen2
XU Silong3
GUI Jun4 1.College of Electric and Electronic Engineering
Related Institution
Datang Xinyang Huayu Power Generation Co., Ltd
Guangdong Electric Power Design and Research Institute
College of Electrical and Electronic Engineering, North China Electric Power University