Co-combustion of lignite in a 300 MW unit bituminous coal fired boiler: problem analysis and treatment
更新时间:2025-09-28
    • Co-combustion of lignite in a 300 MW unit bituminous coal fired boiler: problem analysis and treatment

    • Thermal Power Generation   Vol. 42, Issue 12, Pages: 111-114(2013)
    • CLC: TK223.25
    • Published:2013

    移动端阅览

  • QIN Ling, WANG Hougang, ZHOU Yu, et al. Co-combustion of lignite in a 300 MW unit bituminous coal fired boiler: problem analysis and treatment[J]. Thermal power generation, 2013, 42(12): 111-114. DOI:

  •  
  •  

0

Views

122

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF REPAIR WHEN LEAKAGE OCCURRED ON FOUR KINDS OF TUBES IN THE BOILER OF 300MW UNIT
The influence of primary air rate variation on performance of a tangentially fired lignite boiler
Universal calculation model for pulverizing system of utility boilers and its software development
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES

Related Author

LONG Huiguo
LONG Yi
CHEN HongdongHunan Provincial Electric Power Testing & Research Institute
JING Xiaolei1
BAI Shaolin1
JIN Zhonghua1
YANG Peijun1
ZHAO Junqi1

Related Institution

Hunan Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Qinbei Power Plant
Institute of Thermal Engineering and Power Systems, Zhejiang University
Wuxi Huaguang Boiler Co., Ltd
0