Transient state characteristics of deaerator during RB process of an ultra supercritical 1000MW unit
|更新时间:2025-09-28
|
Transient state characteristics of deaerator during RB process of an ultra supercritical 1000MW unit
Thermal Power GenerationVol. 43, Issue 7, Pages: 61-65(2014)
作者机构:
1. 浙江大学热工与动力系统研究所
2. 浙江省电力设计院
3. 国电浙江北仑第三发电有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2014
稿件说明:
移动端阅览
ZHU Bao, WU Meng, CHEN Liqiang, et al. Transient state characteristics of deaerator during RB process of an ultra supercritical 1000MW unit[J]. Thermal power generation, 2014, 43(7): 61-65.
DOI:
ZHU Bao, WU Meng, CHEN Liqiang, et al. Transient state characteristics of deaerator during RB process of an ultra supercritical 1000MW unit[J]. Thermal power generation, 2014, 43(7): 61-65.DOI:
Transient state characteristics of deaerator during RB process of an ultra supercritical 1000MW unit
摘要
研究超超临界1 000MW机组RB过程中除氧器系统的暂态试验特性
分析除氧器系统凝结水温度、质量、除氧器温度及压力以及给水泵组的参数变化。结果表明:RB过程中
给水泵组的有效汽蚀余量大幅下降
前置泵有可能发生汽蚀
建议布置除氧器时以RB工况为标准核算前置泵有效汽蚀余量下降值
防止汽蚀现象发生;计算前置泵有效汽蚀余量下降值时
将除氧器水焓值设为水箱中间位置处压力所对应的饱和水焓值。
Abstract
The condensate water temperature and quality
temperature and pressure in deaerator
and parameter variation of water pumps were investigated in an ultra supercritical 1 000MW unit during runback(RB)process.The results show that
during the fast load rejection process
the NPSHa of feedwater pumps falls by a significant margin and cavitation may occur in the booster pump.Thus
several suggestions were proposed
such as taking the RB condition as the standard to account the NPSHa drop value of booster pump to prevent the cavitation occurring when arranging the deaerator
setting the enthalpy of water in the deaerator as the enthalpy value of saturated water corresponding to pressure at middle point of the water tank when calculating the NPSHa values.
A PURE HEAT QUANTITY METHOD OF OPTIMIZATION OF ALLOCATING BLED STEAM SOURCES OF THE DEAERATOR
DESIGN OF PRESSURE CONTROL STRATEGY FOR DEAERATOR IN NUCLEAR POWER STATION BASED ON DIGITALIZED CONTROL PLATFORM
TECHNICAL FEATURES OF PIPE-BLOWING ON ULTRA-SUPERCRITICAL 660 MW UNIT IN JINGGUANGSHAN POWER PLANT
STUDY ON AND PRACTICE OF PIPE-BLOWING USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATION PUMP FOR ONCE-THROUGH BOILER OF ULTRA-SUPERITICAL 1 000 MW UNIT
ADAPTABILITY OF 3 000 t/h ULTRA SUPERCRITICAL BOILER FOR MIX BURNING WITH LOW HEAT VALUE COAL
Related Author
SUN Ding
LI Huijun
WANG Fei1
WANG Tong2 1.Department of Automatic Control
FU Longlong
MA Xiaolong
XIN Junfang
ZHAO Jingtao Xi'an Thermal Power Research Institute Co Ltd
Related Institution
Xi'an Jiaotong University
Xi'an Water Conservancy Architecture Survey and Design Institute
Xuzhou Huarun Pengcheng Power Plant
Department of Automatic Control, Shanghai Electric Power University