Performance improvement of IGCC power station by preheating the clean syngas
|更新时间:2025-09-28
|
Performance improvement of IGCC power station by preheating the clean syngas
Thermal Power GenerationVol. 42, Issue 10, Pages: 39-42(2013)
作者机构:
1. 中国能源建设集团广东省电力设计研究院
2. 清华大学电力系统与发电设备控制与仿真国家重点实验室
作者简介:
基金信息:
DOI:
CLC:TM63
Published:2013
稿件说明:
移动端阅览
HAN Long, DENG Guangyi, LI Zheng. Performance improvement of IGCC power station by preheating the clean syngas[J]. Thermal power generation, 2013, 42(10): 39-42.
DOI:
HAN Long, DENG Guangyi, LI Zheng. Performance improvement of IGCC power station by preheating the clean syngas[J]. Thermal power generation, 2013, 42(10): 39-42.DOI:
Performance improvement of IGCC power station by preheating the clean syngas
The GE-Texaco and Shell gasification technology based model of the IGCC power station was established by using the GT PRO software.The unsaturated water extracted from high pressure economizer of waste heat boiler was adopted to preheat the clean syngas
to investigate its influence on such performance as energy distribution
power generation capacity
electricity supply efficiency and net heat consumption rate of the IGCC power station.The simulation results showed that
after the clean syngas was preheated
the proportion of net generation of the GETexaco and Shell IGCC power station to the total input energy increased by 0.2%and 0.3%
respectively;the total input energy of the above two power stations decreased by 26 MW and25MW;the electricity supply efficiency of them rose by 0.26%and 0.36%
and the net heat consumption rate dropped by 51kJ/(kW·h)and 56kJ/(kW·h)
respectively.This indicates that preheating syngas can enhance the overall performance of IGCC power stations.