Control strategy optimization for supercritical unit equipped with double-inlet and double-outlet ball mill
|更新时间:2025-09-28
|
Control strategy optimization for supercritical unit equipped with double-inlet and double-outlet ball mill
Thermal Power GenerationVol. 42, Issue 11, Pages: 16-20(2013)
作者机构:
1. 西安热工研究院有限公司
2. 华能沁北发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK223.25
Published:2013
稿件说明:
移动端阅览
ZHAO Zhidan, HAN Jiliang, LIAN Lingxian, et al. Control strategy optimization for supercritical unit equipped with double-inlet and double-outlet ball mill[J]. Thermal power generation, 2013, 42(11): 16-20.
DOI:
ZHAO Zhidan, HAN Jiliang, LIAN Lingxian, et al. Control strategy optimization for supercritical unit equipped with double-inlet and double-outlet ball mill[J]. Thermal power generation, 2013, 42(11): 16-20.DOI:
Control strategy optimization for supercritical unit equipped with double-inlet and double-outlet ball mill
摘要
某超临界600MW机组采用双进双出钢球磨煤机直吹式制粉系统
不能准确计量入炉煤量
从而严重影响了机组水煤比控制
在机组变负荷过程中出现分离器入口蒸汽过热度、主蒸汽温度波动大等问题
使自动发电控制(AGC)无法正常投入。在对不同工况下磨煤机煤量计算等控制逻辑优化后
使得机组在动态工况下
主蒸汽温度偏差
Abstract
The direct blowing pulverizing system with double-inlet and double-outlet ball mill equipped on a supercritical 600MW unit boiler can not measure the coal quantity into the furnace correctly.Therefore
the water/coal ratio control of the unit was seriously affected.Such problems as large fluctuation of superheating ratio of separator inlet steam and main steam occurred during the unit load varying
so the automatic generation control(AGC)can not be put into service.Thus
optimization of control logic for calculation of coal amount in pulverizer under different conditions was performed.The results showed that
for dynamic working condition
the main steam temperature deviation was within ±5 ℃;the reheat steam temperature deviation was within±10℃;that of the temperature at middle point of the separator was within ±6 ℃;the main steam pressure difference was within ±0.6 MPa;the load deviation was within ±3 MW.While for the stable working condition
the main steam pressure deviation was within±0.3MPa and the load deviation was within±3MW.The normal start of the AGC function was ensured.