Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
|更新时间:2025-09-28
|
Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
Thermal Power GenerationVol. 43, Issue 7, Pages: 139-142(2014)
作者机构:
神华广东国华粤电台山发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK268
Published:2014
稿件说明:
移动端阅览
GAN Chaoqi, LI Chunguang, WANG Yonggang. Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures[J]. Thermal power generation, 2014, 43(7): 139-142.
DOI:
GAN Chaoqi, LI Chunguang, WANG Yonggang. Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures[J]. Thermal power generation, 2014, 43(7): 139-142.DOI:
Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
During shutdown of the subcritical 600MW unit turbines
the main steam valve should be closed tightly and rapidly within 300ms
thus to quickly cut down the high pressure steam source
slow down the turbine speed
and prevent turbine over speed accidents.However
since the commissioning of subcritical600MW steam turbine unit in Taishan Power Plant
the closing time of high pressure main steam valve always exceeded 300ms during the shutdown.Especially
this phenomenon aggravated when the steam turbine ran at high load.Therefore
the reason was analyzed
and the valve stem bending
insufficient spring force and complicate connection force of horizontal lever were considered as the major causes.Finally
several countermeasures were put forward
such as transforming the mode that the lever is connected to the main steam valve into the one that the servomotor is directly connected the main steam valve