您当前的位置:
首页 >
文章列表页 >
Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
更新时间:2025-09-28
    • Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures

    • Thermal Power Generation   Vol. 43, Issue 7, Pages: 139-142(2014)
    • CLC: TK268
    • Published:2014

    移动端阅览

  • GAN Chaoqi, LI Chunguang, WANG Yonggang. Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures[J]. Thermal power generation, 2014, 43(7): 139-142. DOI:

  •  
  •  

0

Views

117

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS AND ELIMINATION OF ABNORMAL SHUT-OFF FOR MAIN STEAM VALVE OF SUBCRITICAL 600 MW STEAM TURBINE

Related Author

ZHANG Jun-jie1
SHI Chao-xi2
YUAN Jun1
DAI Yi-ping31.Beijing Guohua Electric Power Technological Centre

Related Institution

Beijing Guohua Electric Power Technology Center
Beijing Guohua Electric Power Company
Xi'an Jiaotong University
0