您当前的位置:
首页 >
文章列表页 >
Realization of main automatic control in load rejection test for turbine power plants
更新时间:2025-09-28
    • Realization of main automatic control in load rejection test for turbine power plants

    • Thermal Power Generation   Vol. 43, Issue 1, Pages: 106-109(2014)
    • CLC: TM311
    • Published:2014

    移动端阅览

  • WANG Zheng, LI Wei, LI Xiaolin, et al. Realization of main automatic control in load rejection test for turbine power plants[J]. Thermal power generation, 2014, 43(1): 106-109. DOI:

  •  
  •  

0

Views

138

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT AND APPLICATION OF ELECTRIC ACTUATOR IN THE AUTOMATIC CONTROL SYSTEMS
BED-OVERTURN PHENOMENON OF UNDERPANTS LEG IN 300 MW CFB BOILER AND REMEDIAL METHOD THEREOF
OPTIMIZATION OF AUTOMATIC CONTROL STRATEGY UNDER ABNORMAL OPERATING CONDITIONS OF SUBCRITICAL UNITS
PROBLEM ANALYSIS AND CONTROL OPTIMIZATION OF MAIN AUTOMATIC PROTECTION FACILITIES IN THE FGD SYSTEM
Control strategy of SNCR flue gas denitrification system in CFB boilers

Related Author

GAO Wen-yan~2(1.Guohua Ninghai Power Plant
HE Zeng-yao~1
JIANG Mao-qingSichuan Baima CFB Demonstration Power Plant Co Ltd
ZHOU Si-lin
WU Yu-ping
HUANG Zhenxin Huaneng Tongchuan Power Plant
HU Huajie
CHENG Junjun

Related Institution

Beijing Litong High tech Development Co., Ltd
Guohua Ninghai Power Plant
Baima Circulating Fluidized Bed Demonstration Power Station Co., Ltd
Huaneng Tongchuan Power Plant
Zhuzhou Huayin Thermal Power Generation Co., Ltd
0