您当前的位置:
首页 >
文章列表页 >
Air leakage control and energy-saving application of air preheater in thermal power plants
更新时间:2025-09-28
    • Air leakage control and energy-saving application of air preheater in thermal power plants

    • Thermal Power Generation   Vol. 43, Issue 6, Pages: 132-135(2014)
    • CLC: TK223.34
    • Published:2014

    移动端阅览

  • JIN Shengxiang, He Qishan, LI Qianyu, et al. Air leakage control and energy-saving application of air preheater in thermal power plants[J]. Thermal power generation, 2014, 43(6): 132-135. DOI:

  •  
  •  

0

Views

247

下载量

15

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE AND COUNTERMEASURES FOR HIGHER AIR-LEAKAGE RATE OF THE ROTARY AIR PREHEATER USED FOR CFB BOILER OF 300 MW UNIT
Correction calculation method of boiler exhaust temperature under conditions with atypical inlet air temperature and air leakage rate
Determination of load-impacted curve on generation efficiency of coal-fired unit by two-point method

Related Author

LI Xing-hua1
KUANG Wei1
JIANG Jian-zhong2
XIE Zai-liang1 1. Baima CFB Demonstration Power Station Co Ltd
SHE Yuanyuan
ZHANG Qian
ZHOU Ping
ZHANG Fuchun

Related Institution

Baima Circulating Fluidized Bed Demonstration Power Station Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Xi'an Shengsaier Electronics Co., Ltd
Huaneng Weihai Power Generation Co., Ltd
National Energy Fee County Power Generation Co., Ltd
0