Experiment and energy saving retrofitting schemes for primary air fans
|更新时间:2025-09-28
|
Experiment and energy saving retrofitting schemes for primary air fans
Thermal Power GenerationVol. 43, Issue 6, Pages: 149-152(2014)
作者机构:
1. 西安热工研究院有限公司
2. 大唐国际潮州发电有限责任公司
3. 国电谏壁发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK223.26
Published:2014
稿件说明:
移动端阅览
ZHENG Jin, LI Wensheng, ZHU Ning, et al. Experiment and energy saving retrofitting schemes for primary air fans[J]. Thermal power generation, 2014, 43(6): 149-152.
DOI:
ZHENG Jin, LI Wensheng, ZHU Ning, et al. Experiment and energy saving retrofitting schemes for primary air fans[J]. Thermal power generation, 2014, 43(6): 149-152.DOI:
Experiment and energy saving retrofitting schemes for primary air fans
Test study on operation of primary air fans in 1 000MW unit of Datang Chaozhou Power Generation Co.
Ltd.was performed.The results show the primary air fans have large margin and low operation efficiency.Thus
the original AST-2030/1400B primary air fan with blade profile of PP114 was transformed into AST-2030/1400B with blade profile of PP115.Two years running shows the air fan works stably.The annual saved electricity by the improved primary air fans can reach up to 4 892 300(kW·h)
indicating the investment can be recovered within one year.