Automatic control logic optimization for feed-water in start-up period of a 600MW unit
更新时间:2025-09-28
    • Automatic control logic optimization for feed-water in start-up period of a 600MW unit

    • Thermal Power Generation   Vol. 43, Issue 5, Pages: 113-116(2014)
    • CLC: TK223.7
    • Published:2014

    移动端阅览

  • XI Chengchao. Automatic control logic optimization for feed-water in start-up period of a 600MW unit[J]. Thermal power generation, 2014, 43(5): 113-116. DOI:

  •  
  •  

0

Views

108

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT
ANALYSIS AND OPTIMIZATION OF COORDINATED CONTROL SYSTEM FOR SUPERCRITICAL 600 MW UNIT
DESIGN OF CONTROL LOGIC FOR PUTTING TWO STEAM-DRIVEN FEED-WATER PUMPS OF SUPERCRITICAL 660 MW UNIT INTO PARALLEL OPERATION OR STOPPING ONE FROM SERVICE
Feasibility of closed circulating water waste heat utilization in 600MW supercritical unit
Optimization on coordinated control system of supercritical unit in Huaneng Shanghai Shidongkou Second Power Plant

Related Author

LIU Ming-yuan
LIN Feng
WU Quan
LI JingGuodian Dalian Zhuanghe Power Generation Co Ltd
SONG Haihua1
WANG Bochun1
ZHOU Jun2 1.Testing and Research Institute under Hunan Provincial Electric Power Company
LI Tiecang1

Related Institution

Guodian Dalian Zhuanghe Power Generation Co., Ltd
Hunan Electric Power Company Experimental Research Institute
Huadian Changsha Sofa Electric Co., Ltd
Department of Power Engineering, Shanxi Electric Power Vocational College
Datong Power Generation Co., Ltd
0