Discussions on high parameter and large capacity units' commitment without auxiliary steam
|更新时间:2025-09-28
|
Discussions on high parameter and large capacity units' commitment without auxiliary steam
Thermal Power GenerationVol. 43, Issue 4, Pages: 138-140(2014)
作者机构:
华能黑龙江发电有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2014
稿件说明:
移动端阅览
XU Guojun, LI Yin. Discussions on high parameter and large capacity units' commitment without auxiliary steam[J]. Thermal power generation, 2014, 43(4): 138-140.
DOI:
XU Guojun, LI Yin. Discussions on high parameter and large capacity units' commitment without auxiliary steam[J]. Thermal power generation, 2014, 43(4): 138-140.DOI:
Discussions on high parameter and large capacity units' commitment without auxiliary steam
During startup and shutdown process of the units with large capacity and high parameters
the auxiliary steam is usually used as seal steam supply.Thus
the construction investment and operation cost will have to be increased.In order to reduce the investment and operation cost in Huaneng Hegang Power Plant
transformation on draining system of main steam and reheat steam were conducted.Moreover
the startup and shutdown operation procedure was also modified.After the improvement
the unit realized startup and shutdown with no auxiliary steam.Besides
the investment and operation/maintenance cost of the boiler's startup was dramatically saved.