您当前的位置:
首页 >
文章列表页 >
Peaking capability and economic analysis for a 330MW cogeneration unit
更新时间:2025-09-28
    • Peaking capability and economic analysis for a 330MW cogeneration unit

    • Thermal Power Generation   Vol. 43, Issue 6, Pages: 7-10(2014)
    • CLC: TM611
    • Published:2014

    移动端阅览

  • ZHU Yu, LI Qianjun, FENG Yongxin, et al. Peaking capability and economic analysis for a 330MW cogeneration unit[J]. Thermal power generation, 2014, 43(6): 7-10. DOI:

  •  
  •  

0

Views

486

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STUDY ON ON-LINE MONITORING SYSTEM FOR COGENERATION UNITS IN SHANDONG PROVINCE
Effect of environmental temperature on cogeneration units and the countermeasures
Dynamic environmental assessment for natural gas cogeneration systems based on supply-demand coupling analysis
Application of low-grade energy heating technology in central heating by cogeneration
Study on peak regulation capacity of a coal-fired supercritical carbon dioxide cogeneration unit

Related Author

ZHU Wei-yi21.Shandong Electric Power Research Institute
LIU Ji-dong2
SHANG Li2
SUN Wei1
PENG Xinfei School of Energy
LI Meibao
FU Li
FAN Xue

Related Institution

Shandong Electric Power Corporation
Shandong Electric Power Research Institute
College of Energy, Power and Mechanical Engineering, North China Electric Power University
School of Energy and Mechanical Engineering, Shanghai Electric Power University
Department of Power Engineering, Shanxi University
0