Key parameters control during cold state start-up of a 300MW unit with no start-up steam
|更新时间:2025-09-28
|
Key parameters control during cold state start-up of a 300MW unit with no start-up steam
Thermal Power GenerationVol. 43, Issue 8, Pages: 151-152(2014)
作者机构:
1. 四川白马循环流化床示范电站有限责任公司
2. 西安热工研究院有限公司
3. 四川省电力工业调整试验所
4. 四川内江高坝电厂
作者简介:
基金信息:
DOI:
CLC:TK229.66
Published:2014
稿件说明:
移动端阅览
KUANG Wei, YANG Guanglan, GOU Jianbing, et al. Key parameters control during cold state start-up of a 300MW unit with no start-up steam[J]. Thermal power generation, 2014, 43(8): 151-152.
DOI:
KUANG Wei, YANG Guanglan, GOU Jianbing, et al. Key parameters control during cold state start-up of a 300MW unit with no start-up steam[J]. Thermal power generation, 2014, 43(8): 151-152.DOI:
Key parameters control during cold state start-up of a 300MW unit with no start-up steam
The dangerous points of cold state start-up of a 300 MW unit without start-up steam were introduced.Through control of the key parameters(such as the drum wall temperature difference
drainage flow at the boiler side
steam temperature and pressure and reburning of the flue gas in tail duct)during the unit start-up
the problems easily occurred during the unit start-up with no start-up steam can be avoided