Reason analysis and disposals of turbine's speed rise during unit's turning gear operation
|更新时间:2025-09-28
|
Reason analysis and disposals of turbine's speed rise during unit's turning gear operation
Thermal Power GenerationVol. 43, Issue 10, Pages: 107-109(2014)
作者机构:
1. 贵州电力试验研究院
2. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TK268
Published:2014
稿件说明:
移动端阅览
WANG Jiasheng, ZHAO Jie, ZHONG Jingliang, et al. Reason analysis and disposals of turbine's speed rise during unit's turning gear operation[J]. Thermal power generation, 2014, 43(10): 107-109.
DOI:
WANG Jiasheng, ZHAO Jie, ZHONG Jingliang, et al. Reason analysis and disposals of turbine's speed rise during unit's turning gear operation[J]. Thermal power generation, 2014, 43(10): 107-109.DOI:
Reason analysis and disposals of turbine's speed rise during unit's turning gear operation
摘要
针对某300MW机组汽轮机在非挂闸状态下盘车脱扣、升速事故进行了分析。结果表明
汽轮机本体内外缸疏水系统窜蒸汽是造成汽轮机转速飞升的根本原因。对此
将存在缺陷的疏水管道直接引入凝汽器后故障消除
汽轮机转速恢复正常
机组甩负荷试验顺利完成。
Abstract
By analyzing an abnormal incident of steam turbo-generator's speed rise under unit's turning gear operation state
this paper presents concrete accident treatment schemes and finds the main causes of the accident.The results show that steam channeling between turbine's inner and outer cylinder by drainage system was the major reason for the turbine speed's sudden rise.After the defected drainage pipes were directly introduced to the condenser
the fault was eliminated and the turbine speed returned to normal.Thus the unit load rejection test was successfully carried out.The analyses and disposals of the accident can be good references for unit's design
overhaul and operation and will be a good caution action for some unit's techniques reconstruction and new building projects.