Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research
|更新时间:2025-09-28
|
Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research
Thermal Power GenerationVol. 43, Issue 11, Pages: 69-74(2014)
作者机构:
1. 东北电力大学能源与动力工程学院
2. 东北电力大学自动化工程学院
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2014
稿件说明:
移动端阅览
ZHOU Yunlong, WANG Di, CHEN Lijun. Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research[J]. Thermal power generation, 2014, 43(11): 69-74.
DOI:
ZHOU Yunlong, WANG Di, CHEN Lijun. Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research[J]. Thermal power generation, 2014, 43(11): 69-74.DOI:
Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research
In order to investigate the dynamic characteristics of main steam pressure at the beginning of fast cut back(FCB)
the model of the steam water system for a 300 MW unit was established.Moreover
on the basis of this model
FCB simulation test under 100%load condition was conducted.The results show that:the pressure control effect of small capacity high pressure bypass equipped with pressure control valve(PCV)was better than that of the large capacity bypass;reducing the early high pressure bypass valve open time was effective for main steam pressure control during initial FCB;the unit with total pressure relief volume from high pressure bypass and PCV less than 65%BMCR was not suitable for carrying out FCB.