您当前的位置:
首页 >
文章列表页 >
Integration of CO2 capture device and power plant:numerical simulation
更新时间:2025-09-28
    • Integration of CO2 capture device and power plant:numerical simulation

    • Thermal Power Generation   Vol. 44, Issue 4, Pages: 27-32(2015)
    • CLC: TM621
    • Published:2015

    移动端阅览

  • LYU Tai, MA Junkunpeng, HAN Guofu, et al. Integration of CO2 capture device and power plant:numerical simulation[J]. Thermal power generation, 2015, 44(4): 27-32. DOI:

  •  
  •  

0

Views

156

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET
INFLUENCE OF OVER-FIRED AIR ADJUSTMENT IN BOILER FOR IMPORTED ULTRA-SUPECRITICAL 600 MW UNIT UPON NOx EMISSION AND ECONOMIC EFFICIENCY IN OPERATION OF THE BOILER
OPTIMIZATION OF CONTROL STRATEGE FOR TEMPERATURE-REDUCING REGULATION OF LOW-PRESSRUE SHAFT SEAL ON STEAM TURBINES
STUDY ON ANALYSIS AND APPLICATION OF CHARACTERISTIC FLOW PASSAGE AREA IN STEAM TURBINES
Water flow control during start-up of an ultra supercritical 600MW unit once-through boiler with circulating pump

Related Author

CHEN Hua-gui1
TIAN Li21.Jiangsu Provincial Electric Power Testing and Research Institute Co Ltd
LIU Qi1
L Guo-qiang1
YU Cun-xi1
ZHANG Yue-hai21.Xi'an Thermal Power Research Institute Co Ltd
CHEN Zhigang1
ZHAO Zhidan1

Related Institution

Jiangsu Electric Power Test and Research Institute Co., Ltd
Nanjing University of Aeronautics and Astronautics Jincheng College
Xi'an Thermal Power Research Institute Co., Ltd
Hangzhou Quality and Technical Supervision and Testing Institute
Guangdong Heyuan Power Plant
0