您当前的位置:
首页 >
文章列表页 >
Heat supply transformation for four 215MW units using steam extraction
更新时间:2025-09-28
    • Heat supply transformation for four 215MW units using steam extraction

    • Thermal Power Generation   Vol. 44, Issue 5, Pages: 87-90(2015)
    • CLC: TM621
    • Published:2015

    移动端阅览

  • WU Bin, SHAO Zhiyue, HU Xin, et al. Heat supply transformation for four 215MW units using steam extraction[J]. Thermal power generation, 2015, 44(5): 87-90. DOI:

  •  
  •  

0

Views

196

下载量

14

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis on energy saving potentials of overheat recovery of steam extractions for double-reheat power unit
Simplified calculation method for economical indexes of heating units
Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics
APPLICATION OF Simatic PCS7 DISTRIBUTED CONTROL SYSTEM ON GAS & STEAM TURBINE COMBINED CYCLE GENERATING UNIT
DEVELOPMENT AND APPLICATION OF HYDRAULIC TENSILE BOLTS FOR SHAFT COUPLINGS OF TURBO-GENERATOR SETS

Related Author

YAN Junjie
WANG Chaoyang
ZHAO Yongliang
LIU Ming
LI Heng
LENG Min
JIA Hongjin
CHENG Lei

Related Institution

State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
Xi’an Electric Power College
Huaneng Nanjing Power Plant
China Huaneng Group
School of Control and Computer Engineering, North China Electric Power University
0