Control strategy for water wall overheat in a 1000MW ultra supercritical unit
|更新时间:2025-09-28
|
Control strategy for water wall overheat in a 1000MW ultra supercritical unit
Thermal Power GenerationVol. 44, Issue 8, Pages: 99-103(2015)
作者机构:
广东电网有限责任公司电力科学研究院
作者简介:
基金信息:
DOI:
CLC:TM621.2
Published:2015
稿件说明:
移动端阅览
ZHU Yaqing, ZHANG Xi. Control strategy for water wall overheat in a 1000MW ultra supercritical unit[J]. Thermal power generation, 2015, 44(8): 99-103.
DOI:
ZHU Yaqing, ZHANG Xi. Control strategy for water wall overheat in a 1000MW ultra supercritical unit[J]. Thermal power generation, 2015, 44(8): 99-103.DOI:
Control strategy for water wall overheat in a 1000MW ultra supercritical unit
摘要
基于对某超超临界1 000MW机组锅炉水冷壁超温特性的分析
提出一种通过改变给水流量和调整减温水与给水流量比值的锅炉水冷壁温度控制策略
并在各种易发生锅炉水冷壁超温的工况下进行了机组升、降负荷试验。结果表明
该控制策略通过预判断水冷壁超温趋势超前调整锅炉给水流量
从而很好地抑制了超温
且对机组负荷、主蒸汽压力等参数的影响不大。
Abstract
To solve the over temperature problem of water walls in ultra supercritical boilers
a control strategy that prevents the water wall from being overheated by regulating the ratio of feed water flow to desuperheater water was proposed
on the basis of the investigation on an ultra supercritical 1 000 MW unit.Moreover
this control strategy was applied on this unit and achieved good control effect.Repeatable load increasing and decreasing tests were carried out under each condition that water wall overheat easily occurs.The results show that
this control strategy can regulate the water flow in advance
so it can inhibit the overheat of water walls.However
regulations on the boiler feedwater flow had little effect on the unit load and main steam pressure.
OPTIMIZATION OF CONTROL STRATEGE FOR TEMPERATURE-REDUCING REGULATION OF LOW-PRESSRUE SHAFT SEAL ON STEAM TURBINES
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
Fruit fly optimization algorithm based high efficiency and low NOx combustion modeling for a boiler
Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Water wall temperature deviation of an ultra-supercritical 1 000 MW unit boiler: analysis and countermeasures
Related Author
CHEN Zhigang1
ZHAO Zhidan1
ZHANG Diancong2
WANG Yuanping2
HAO Defeng11.Xi'an Thermal Power Research Institute Co Ltd
LI Xinhu Guangzhou Yueneng Electric Power Science and Technology Development Co Ltd
ZHANG Zhenxing
SUN Baomin
Related Institution
Xi'an Thermal Power Research Institute Co., Ltd
Guangdong Heyuan Power Plant
Guangzhou Yueneng Electric Power Technology Development Co., Ltd
Key Laboratory of Power Station Equipment Status Monitoring and Control, Ministry of Education, North China Electric Power University