Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation
|更新时间:2025-09-28
|
Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation
Thermal Power GenerationVol. 44, Issue 10, Pages: 119-123(2015)
作者机构:
1. 山西大学自动化系
2. 内蒙古乌斯太热电厂
3. 山西大学动力系
4. 晋能电力集团有限公司嘉节燃气热电分公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2015
稿件说明:
移动端阅览
LI Junhong, LYU Ping, FENG Jiangtao, et al. Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation[J]. Thermal power generation, 2015, 44(10): 119-123.
DOI:
LI Junhong, LYU Ping, FENG Jiangtao, et al. Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation[J]. Thermal power generation, 2015, 44(10): 119-123.DOI:
Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation
In order to improve the economic efficiency of unit 1in Wusitai Thermal Power Plant in Inner Mongolia
technical transformation on the feedwater system was carried out.Two of three scoop tube speed-regulating electricicty-driven feedwater pumps were changed into one-to-two frequency variable speed-regulating feedwater pumps.Moreover
the feedwater control logic was optimized
the frequency conversion control function was added
and a fault situation backup start permit function was set up.The application results show that
after the transformation
the electricity consumption of the feedwater system decreased and the unit operation safety was also improved.