Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units
|更新时间:2025-09-28
|
Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units
Thermal Power GenerationVol. 45, Issue 2, Pages: 105-109(2016)
作者机构:
1. 西安热工研究院有限公司
2. 深圳市广前电力有限公司
作者简介:
基金信息:
DOI:
CLC:TM611.31
Published:2016
稿件说明:
移动端阅览
CAI Hui, LAI Xinhua, SHI Zhigang, et al. Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units[J]. Thermal power generation, 2016, 45(2): 105-109.
DOI:
CAI Hui, LAI Xinhua, SHI Zhigang, et al. Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units[J]. Thermal power generation, 2016, 45(2): 105-109.DOI:
Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units
penetrant testing and ultrasonic testing were conducted for domestic first set of 9Fgas turbine unit which has run for 10 years in double-shift mode.Considering the thermal stress caused by temperature difference between the inner and outer wall of boiler drum during start and stop process
the low cycle fatigue life of the drum material was estimated.The boiler drum's detection results show it is qualified to run
and after about 27 300h/1 249cycles' run
the cumulative life loss of the drum is 0.135 2and its rest fatigue life is 38years/6 955 cycles.