Optimization design of steam turbine with double-reheat in a 1 350MW ultra-supercritical unit
更新时间:2025-09-28
    • Optimization design of steam turbine with double-reheat in a 1 350MW ultra-supercritical unit

    • Thermal Power Generation   Vol. 45, Issue 1, Pages: 110-116(2016)
    • CLC: TM621
    • Published:2016

    移动端阅览

  • ZHANG Xiaoling, YAN Weiping, LIU Liheng, et al. Optimization design of steam turbine with double-reheat in a 1 350MW ultra-supercritical unit[J]. Thermal power generation, 2016, 45(1): 110-116. DOI:

  •  
  •  

0

Views

467

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Thermal economic analysis on an ultra supercritical unit with second reheat cycle
Control and optimization of water/coal ratio for an ultra supercritical 1 000 MW unit
Computational analysis on hydrodynamic characteristics and flow instability of an ultra supercritical 1 000 MW double-reheat unit boiler
ADAPTABILITY OF 3 000 t/h ULTRA SUPERCRITICAL BOILER FOR MIX BURNING WITH LOW HEAT VALUE COAL
CONTROL STRATEGY OF PRIMARY FREQUENCY REGULATION AND ITS OPTIMIZATION FOR 2×600 MW ULTRA SUPERCRITICAL UNITS IN HEYUAN POWER PLANT

Related Author

GU Yaxiu
WANG Shengpeng
YANG Shoumin
ZHU Baotian
ZHAO Zhidan
WANG Haitao
ZHANG Zhi
WANG Xiaoyong

Related Institution

School of Environmental Science and Engineering, Chang'an University
Xi'an Thermal Power Research Institute Co., Ltd
Liaoning Huadian Tieling Power Generation Co., Ltd
State Key Laboratory of Multiphase Flow for Power Engineering, Xi'an Jiaotong University
State Key Laboratory of Efficient and Clean Coal fired Power Plant Boiler of Harbin Boiler Works Co., Ltd
0