Fieldbus commissioning method and problem handling for coal-fired power plants
|更新时间:2025-09-28
|
Fieldbus commissioning method and problem handling for coal-fired power plants
Thermal Power GenerationVol. 45, Issue 5, Pages: 117-120(2016)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2016
稿件说明:
移动端阅览
TAN Xiangshuai, CHEN Kun, GAO Kui. Fieldbus commissioning method and problem handling for coal-fired power plants[J]. Thermal power generation, 2016, 45(5): 117-120.
DOI:
TAN Xiangshuai, CHEN Kun, GAO Kui. Fieldbus commissioning method and problem handling for coal-fired power plants[J]. Thermal power generation, 2016, 45(5): 117-120.DOI:
Fieldbus commissioning method and problem handling for coal-fired power plants
the fieldbus commissioning process is lack of standardization
the failure cause is not easy to distinguish
and the commissioning efficiency is low.Against this problem
this paper summarized the Profibus and FF fieldbus commissioning methods and the matters needing attentions
on the basis of the fieldbus commissioning process in Huaneng Jiutai power plant and Huaneng Jinling gas turbine power plant.Moreover
the phenomena commonly occurred during the fieldbus control system commissioning process were analyzed
such as the communication failure in fieldbus link
the communication failure at a certain point in the fieldbus link
the instability of multiple signals in the same fieldbus link.Furthermore
several reasons causing the failures were put forward.It suggests that the fieldbus commissioning should be performed according to the following procedure.First of all
we should know well about the fieldbus communication system
then check the cable
wiring and the integrity of the bus link
and test the bus equipment.At last
carry out equipment parameter check and transmission confirmation.