您当前的位置:
首页 >
文章列表页 >
Failure analysis of flange used for urea hydrolysis equipment
更新时间:2025-09-28
    • Failure analysis of flange used for urea hydrolysis equipment

    • Thermal Power Generation   Vol. 45, Issue 6, Pages: 111-115(2016)
    • CLC: TQ113.2;TG142.71
    • Published:2016

    移动端阅览

  • HUANG Jinyang, YANG Zheng, LU Jintao, et al. Failure analysis of flange used for urea hydrolysis equipment[J]. Thermal power generation, 2016, 45(6): 111-115. DOI:

  •  
  •  

0

Views

150

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF REPAIR WHEN LEAKAGE OCCURRED ON FOUR KINDS OF TUBES IN THE BOILER OF 300MW UNIT
Pitting corrosion behavior of TP304 stainless steel in urban reclaimed water
Typical faults and countermeasures of flue gas cooler for coal-fired boilers
PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
CAUSE ANALYSIS OF WATER-WALL TUBE BURST AND LEAKAGE FOR A 2100t/h BOILER

Related Author

LONG Huiguo
LONG Yi
CHEN HongdongHunan Provincial Electric Power Testing & Research Institute
ZHANG Guiquan
LIU Feng
LIN He
ZHANG Heng
WEN Huifeng

Related Institution

Hunan Electric Power Test and Research Institute
Huaneng Hainan Power Generation Co., Ltd. Dongfang Power Plant
State Key Laboratory of Multiphase Flow for Power Engineering, Xi'an Jiaotong University
China Energy Engineering Group Shaanxi Electric Power Design Institute Co., Ltd
Huaneng Changjiang Environmental Protection Technology Co., Ltd
0