您当前的位置:
首页 >
文章列表页 >
Fuel fast cutting plan for thermal power unit during FCB process
更新时间:2025-09-28
    • Fuel fast cutting plan for thermal power unit during FCB process

    • Thermal Power Generation   Vol. 45, Issue 10, Pages: 121-126(2016)
    • CLC: TM621
    • Published:2016

    移动端阅览

  • SUN Lingfang, LANG Kun, REN He. Fuel fast cutting plan for thermal power unit during FCB process[J]. Thermal power generation, 2016, 45(10): 121-126. DOI:

  •  
  •  

0

Views

102

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Control strategy for automatic parallel operation of feed water pumps in a 630 MW coal-fired unit
Desired dynamic equation control based on maximum-sensitivity-constraint and its application in thermal power units
WAYS FOR REDUCING TEMPERATURE RISE OF THE BEARING SHOES FOR MTZ 3560 TYPE COAL PULVERIZER
CAUSE ANALYSIS OF QUALITY DETERIORATION FOR FIRE RESISTANT OIL USED IN YIMIN POWER PLANT AND COUNTERMEASURES THEREOF
DEVELOPMENT OF SPARE SPACE FOR DISTRIBUTED CONTROL SYSTEM AND ITS APPLICATION IN ENGINEERING

Related Author

WANG Xihui
CHEN Houtao
PENG Shuangjian
FU Qiang
XUN Xin
SHI Gengjin
WU Zhenlong
YANG Zhongming

Related Institution

State Grid Hunan Electric Power Company Electric Power Science Research Institute
Hunan Xiangdian Experimental Research Institute Co., Ltd
Hunan Provincial Key Laboratory of Efficient and Clean Thermal Power Generation Technology
中国电力国际发展有限公司
郑州大学电气与信息工程学院
0