您当前的位置:
首页 >
文章列表页 >
Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants
更新时间:2025-09-28
    • Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants

    • Thermal Power Generation   Vol. 45, Issue 9, Pages: 128-133(2016)
    • CLC: X773
    • Published:2016

    移动端阅览

  • PANG Shenglin, CHEN Rong, MAO Jin, et al. Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants[J]. Thermal power generation, 2016, 45(9): 128-133. DOI:

  •  
  •  

0

Views

642

下载量

31

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Balance calculation for zero discharge system of desulfurization wastewater using low temperature flue gas evaporation method
Experiment on water balance of the carbon capture system using chemical absorption method in coal-fired power plants
STUDY AND APPLICTION OF MICROBIAL FLOCCULANTS
OPTIMIZATION OF WATER BALANCE AND ANALYSIS OF WATER CONSUMPTION INDICES IN THERMAL POWER PLANTS
Experimental research on water balance of flue gas desulfurization system in jet bubbling reactor

Related Author

YE Chunsong
LI Qing
CAO Rong
ZHU Wenyu
ZHENG Wei
LIANG Wei
XU Jiaqing
FANG Mengxiang

Related Institution

School of Power and Mechanical Engineering, Wuhan University
Chengdu Ruisi Environmental Protection Technology Co., Ltd
Hubei Energy Group Co., Ltd
National Energy Group Science and Technology Research Institute Co., Ltd
Zhejiang University Qingshanhu Energy Research Base
0