Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants
|更新时间:2025-09-28
|
Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants
Thermal Power GenerationVol. 45, Issue 9, Pages: 128-133(2016)
作者机构:
1. 华能国际电力股份有限公司玉环电厂
2. 华能国际电力股份有限公司
3. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:X773
Published:2016
稿件说明:
移动端阅览
PANG Shenglin, CHEN Rong, MAO Jin, et al. Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants[J]. Thermal power generation, 2016, 45(9): 128-133.
DOI:
PANG Shenglin, CHEN Rong, MAO Jin, et al. Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants[J]. Thermal power generation, 2016, 45(9): 128-133.DOI:
Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants
The wastewater formed during desulfurization process has characteristics of unstable quantity
complicate water quality and high salt content.The main objective of wastewater treatment at present is standardized sluicing or solidification stabilization which comes but with high investment and energy consumption.Thus
the quality feature of the wastewater from FGD system was described in detail and a new treatment progress without chemical dosing pretreatment was developed in this paper
which can separate and gather the salt component of the FGD wastewater with the aid of membrane concentration and is adopted in the pilot scale test in Yuhuan Huanneng Power Plant.The results show that
the monovalent and divalent ions can be significantly separated by nanofiltration to concentrate the FGD wastewater.In addition
the new formed NaCl solution can be used to produce chemicals such as sodium hypochlorite.This process achieves water balance on the premise of salt balance of the FGD wastewater system
eliminates the errors of the conventional treatment process and realizes true resource recovery of the FGD wastewater.