Optimization of flue duct for a 600 MW thermal power unit
|更新时间:2025-09-28
|
Optimization of flue duct for a 600 MW thermal power unit
Thermal Power GenerationVol. 46, Issue 4, Pages: 120-124(2017)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2017
稿件说明:
移动端阅览
LI Kailun, SUN Dawei, ZHU Hongwei, et al. Optimization of flue duct for a 600 MW thermal power unit[J]. Thermal power generation, 2017, 46(4): 120-124.
DOI:
LI Kailun, SUN Dawei, ZHU Hongwei, et al. Optimization of flue duct for a 600 MW thermal power unit[J]. Thermal power generation, 2017, 46(4): 120-124.DOI:
Optimization of flue duct for a 600 MW thermal power unit
In order to compare the effects of energy conservation and resistance reduction between circular flues and square flues
this paper takes the flue gas duct optimization project of unit No.2(600 MW) of Yangxi Power Plant as the example
to investigate the resistances of flue gas duct before and after the reformation
by test measurement and numerical simulation. The results show that
after the circular flue was applied
the flue resistance reduced by 570 Pa and declined by 76.7%
and the power consumption sharply reduced by 9.6%. This study has very important theoretical guidance and engineering significance for the subsequent flue gas duct reformation.