Flue gas waste heat deep cascade utilization and emission reduction system for once-through lignite boiler
|更新时间:2025-09-28
|
Flue gas waste heat deep cascade utilization and emission reduction system for once-through lignite boiler
Thermal Power GenerationVol. 46, Issue 10, Pages: 94-99(2017)
作者机构:
中国神华能源股份有限公司胜利能源分公司
作者简介:
基金信息:
DOI:
CLC:TK115;TM621.2
Published:2017
稿件说明:
移动端阅览
ZHENG Guokuan. Flue gas waste heat deep cascade utilization and emission reduction system for once-through lignite boiler[J]. Thermal power generation, 2017, 46(10): 94-99.
DOI:
ZHENG Guokuan. Flue gas waste heat deep cascade utilization and emission reduction system for once-through lignite boiler[J]. Thermal power generation, 2017, 46(10): 94-99.DOI:
Flue gas waste heat deep cascade utilization and emission reduction system for once-through lignite boiler
To improve the unit thermal efficiency and reduce pollutants emissions
two once-through lignite boilers in a power plant have adopted the flue gas waste heat deep cascade utilization and emission reduction system to heat the high pressure feed water and hot condensation water. Experimental study and operational effect analysis on the running and stop running system were performed. The results show that
after the flue gas waste heat deep cascade utilization and emission reduction system was put into service
at 660 MW
the actual measured coal consumption for power generation and power supply declined by 4.97 g/(k W·h) and 5.12 g/(k W·h)
respectively. At high loads
the dust emission concentration
desulfurization process water
draft fan and induced draft fan current decreased greatly. The annual economic benefit of single unit is about 7.50 million yuan
and the payback period of the equipment investment is about 6 years. It is suggested that the bypass diameter be enlarged to increase the flue gas temperature
and the soot blowing frequency be increased to compensate the insufficient soot blowing capability of the compressed air rotary ash removal system.
Thermal economic analysis of flue gas pre-drying lignite
Sludge-coupled power generation technology in coal-fired power plant
Simulation modelling of power system for supercritical units considering dynamic heat exchange of once-through boiler
Research on peaking capacity and economy of bypass heat storage scheme for double reheat units
PRELIMINARY ANALYSIS OF REQUIREMENTS TO WATER-WALL SYSTEM PERFORMANCE FOR SERVICE OPERATION OF SUPERCRITICAL PRESSURE ONCETHROUGH BOILER OF 600MW UNITS
Related Author
WANG Zhichao
YAO Wei
ZHANG Xiaohong
MENG Yi
WANG Guifang
CHEN Dayuan
WANG Zhichao
LI Yuhang
Related Institution
Xi'an Thermal Power Research Institute Co., Ltd
Sichuan Electric Power Industry Adjustment and Testing Institute
Department of Electrical Engineering and Applied Electronic Technology, Tsinghua University
National Key Laboratory of New Power System Operation and Control, Tsinghua University