您当前的位置:
首页 >
文章列表页 >
Techno-economic analysis and numerical simulation for four incorporate towers engineering in supercritical 2×350 MW units
更新时间:2025-09-28
    • Techno-economic analysis and numerical simulation for four incorporate towers engineering in supercritical 2×350 MW units

    • Thermal Power Generation   Vol. 46, Issue 12, Pages: 123-128(2017)
    • CLC: TM621
    • Published:2017

    移动端阅览

  • ZHANG Jinliang. Techno-economic analysis and numerical simulation for four incorporate towers engineering in supercritical 2×350 MW units[J]. Thermal power generation, 2017, 46(12): 123-128. DOI:

  •  
  •  

0

Views

75

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

SUPERFICIAL VIEWS TO ENHANCING THE LEVEL OF DCS CONTROL FOR 2×600MW SUPERCRITICAL UNITS IN SHANWEI POWER PLANT
TECHNICAL FEATURES OF LARGE-CAPACITY SUPERCRITICAL BOILERS FOR BURNING SHENHUA COAL
COMPARISON OF PRESSURE-STABILIZING METHOD AND PRESSURE-REDUCING METHOD FOR STEAM BLOWING BOILER OF SUPERCRITICAL UNITS
STATUS QUO OF RESEARCH AND DEVELOPMENT FOR LARGE-CAPACITY CFB BOILERS AND RECOMMENDATIONS THEREOF
THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT

Related Author

ZENG Hao
CHENG Zhi-qiang
GU Xiao-yu
XIANG Da-guang YAO Wei
LIU Jia-yu 1.China Shenhua Energy Resourse Co Ltd
Beijing 100081
WANG Hong-yu1
CHEN Xin-yu2

Related Institution

Honghai Bay Power Generation Co., Ltd.
Xi'an Thermal Power Research Institute Co., Ltd
China Shenhua Energy Co
Jiangsu Electric Power Construction Third Engineering Company
Huaneng Taicang Power Generation Co., Ltd
0