您当前的位置:
首页 >
文章列表页 >
TUBE FAILURE ANALYSIS OF A 410t/h CFB BOILER.
更新时间:2025-09-28
    • TUBE FAILURE ANALYSIS OF A 410t/h CFB BOILER.

    • Thermal Power Generation   Issue 1, (1999)
    • CLC: TM621.2
    • Published:1999

    移动端阅览

  • TUBE FAILURE ANALYSIS OF A 410t/h CFB BOILER.[J]. Thermal power generation, 1999, (1). DOI:

  •  
  •  

0

Views

33

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DESIGN AND OPERATION OF 480 t/h CFB BOILER
niformity improvement for bed temperature of a 300 MW unit CFB boiler
DESCRIPTION OF THE FIRSTLY IMPORTED 300MW CFB BOILER AND ITS KEY TECHNICAL SPECIALITIES
MATHEMATICAL MODEL AND PREVENTIVE MEASURES OF WEAR-OUT IN CFB BOILERS
RETROFIT OF PLATEN REHEATER FOR 480t/h CFB BOILER

Related Author

包绍麟
吕清刚
那永洁
孙运凯
沈解忠
苏小平
李俊
李雪忠

Related Institution

Institute of Engineering Thermophysics, Chinese Academy of Sciences
Wuxi Huaguang Boiler Co., Ltd
Huadian Wuda Thermal Power Co., Ltd
Huaneng Clean Energy Research Institute Co.,Ltd.
Shanxi International Energy Group Limited Company
0