您当前的位置:
首页 >
文章列表页 >
SAFETY ASSESSMENT OF AN OVER…SERVICED 12Cr1MoV STEAM PIPE
更新时间:2025-09-28
    • SAFETY ASSESSMENT OF AN OVER…SERVICED 12Cr1MoV STEAM PIPE

    • Thermal Power Generation   Issue 1, (1999)
    • CLC: TM621.72
    • Published:1999

    移动端阅览

  • SAFETY ASSESSMENT OF AN OVER…SERVICED 12Cr1MoV STEAM PIPE[J]. Thermal power generation, 1999, (1). DOI:

  •  
  •  

0

Views

55

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experiments about co-firing shale with Zhundong coal in a 100 MW unit boiler
Retrofitting of reheaters in 300 MW and 600 MW unit pulverized coal boilers
EVALUATION OF STRUCTURAL PERFORMANCE FOR 12Cr1MoV STEAM CONDUIT FROM BOILER OF UNIT NO4 IN JINZHUSHAN POWER PLANT
STUDY ON OPERATION OF WET DESULPHURIZATION SYSTEM FOR FLUE DUCT WITHOUT BYPASS
Analysis of security and reliability of supercritical and ultra-supercritical generating units

Related Author

SONG Wenqi
LI Xiaojiang
QIN Ling
CHEN Fanmin
WANG Penghui
WANG Jiarui
ZHAO Bing
CAI Xinchun

Related Institution

Xinlian Coal Chemical Industry and Trade Co., Ltd.
Huadian Electric Power Research Institute
Institute of Metals, Chinese Academy of Sciences
Hunan Electric Power Test and Research Institute
Wuhan University
0