Impact of Inductive Coupling Effects on Communication Feeder for Inspection Robot in High-voltage Power Cable Tunnel
|更新时间:2025-12-08
|
Impact of Inductive Coupling Effects on Communication Feeder for Inspection Robot in High-voltage Power Cable Tunnel
Vol. 41, Issue 8, Pages: 2697-2705(2015)
作者机构:
华北电力大学控制与计算机工程学院
作者简介:
基金信息:
DOI:
CLC:
Published Online:31 August 2015,
Published:2015
稿件说明:
移动端阅览
WU Hua, ZHANG Ye, YANG Guotian, et al. Impact of Inductive Coupling Effects on Communication Feeder for Inspection Robot in High-voltage Power Cable Tunnel[J]. 2015, 41(8): 2697-2705.
DOI:
WU Hua, ZHANG Ye, YANG Guotian, et al. Impact of Inductive Coupling Effects on Communication Feeder for Inspection Robot in High-voltage Power Cable Tunnel[J]. 2015, 41(8): 2697-2705.DOI:
Impact of Inductive Coupling Effects on Communication Feeder for Inspection Robot in High-voltage Power Cable Tunnel
The communication cables for inspection robot would be heavily influenced by the electromagnetic produced by the power cable in the cable tunnel. Therefore
we studied the inductive coupling effects of the high-voltage power cable tunnel on communication lines according to the actual situation of cable tunnel. First
we studied the inductive coupling between single-wire power cable lines and communication lines as well as the inductive coupling between three-phase power cable lines and communication lines from the basic theory of the electromagnetic field; Then
we calculated and analyzed the risk impacts of the single power cable line and typical wiring mode three-phase power cable line to the communication cable line; Finally
taking the underground cable tunnels in Beijing for example
we proved the method to be correct by theoretically analyzing and field testing the inductive longitudinal electromotive force of communication lines. The results show that the inductive coupling effects caused by single power line to communication lines is larger
while the inductive coupling effects caused by the three-phase power lines to communication lines can be controlled within the allowable values of national standard. Thus
analyzing the inductive coupling between the two lines can provide the basis for the design of the communication line in cable tunnel
it has an important significance to the development of robot automation inspection for the cable tunnel.