您当前的位置:
首页 >
文章列表页 >
Selection Criteria of High-voltage Submarine Cables for Offshore Wind Farms by Life Cycle Cost
更新时间:2025-12-08
    • Selection Criteria of High-voltage Submarine Cables for Offshore Wind Farms by Life Cycle Cost

    • Vol. 41, Issue 8, Pages: 2674-2680(2015)
    • Published Online:31 August 2015,

      Published:2015

    移动端阅览

  • LIU Gang, CAO Jingying, LU Ying, et al. Selection Criteria of High-voltage Submarine Cables for Offshore Wind Farms by Life Cycle Cost[J]. 2015, 41(8): 2674-2680. DOI:

  •  
  •  

0

Views

0

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

频域反射法在海缆局部缺陷诊断中的应用评述
Transformer Failure Prediction Based on Cloud Reasoning and Weighted Implicit Semi-Markov Model
Simulation Calculation and Analysis on the MMC-HVDC Cable Over-voltage
Life Prediction for Protection System of Traction Substation Based on Weibull Distribution
Impact of Protection Hidden Failures on the Development of Power System Cascading Failures

Related Author

HE Jinghan
ZHANG Jiabao
WANG Li
LI Meng
ZHU Yiyi
WANG Haoyue
ZHOU Quan
SUN Chao

Related Institution

Yangtze Three Gorges Group Jiangsu Energy Investment Co., Ltd.
School of Electrical Engineering, Beijing Jiaotong University
National Key Laboratory of Gas Disaster Detecting,Preventing and Emergency Controlling, Chongqing Branch of China Coal Research Institute
Yueyang Power Supply Bureau,State Grid Hunan Electric Power Grid
State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University
0