Computation of Transient Electromagnetic Field Emission from Enclosure During GIS Disconnector Switching Operations
|更新时间:2025-12-08
|
Computation of Transient Electromagnetic Field Emission from Enclosure During GIS Disconnector Switching Operations
Vol. 42, Issue 3, Pages: 980-986(2016)
作者机构:
1. 中国电力科学研究院武汉分院电网环境保护国家重点实验室
2. 浙江大学电气工程学院
作者简介:
基金信息:
DOI:
CLC:
Published Online:31 March 2016,
Published:2016
稿件说明:
移动端阅览
GAN Zheyuan, ZHAO Jun, ZHANG Jiangong, et al. Computation of Transient Electromagnetic Field Emission from Enclosure During GIS Disconnector Switching Operations[J]. 2016, 42(3): 980-986.
DOI:
GAN Zheyuan, ZHAO Jun, ZHANG Jiangong, et al. Computation of Transient Electromagnetic Field Emission from Enclosure During GIS Disconnector Switching Operations[J]. 2016, 42(3): 980-986.DOI:
Computation of Transient Electromagnetic Field Emission from Enclosure During GIS Disconnector Switching Operations
intelligent equipment is increasingly applied in substations. Disconnector operation in gas insulated switchgear(GIS) always produces electromagnetic field emissions. Therefore
it has very important reference significance to analyze the electromagnetic field distribution for the electromagnetic compatibility design of the electronic equipment installed around the GIS enclosures. We established the circuit models of grounding enclosure and electromagnetic emission
and calculated the electromagnetic field caused by the enclosure current during switching operation. The results show that the electromagnetic field waveform follows the enclosure current waveform. Near the enclosure
the electromagnetic field decays fast
far from the enclosure
electric field decays linearly while magnetic field decays exponentially. With the number increasing of grounding points
the amplitude of TEV decreases obviously
and the electromagnetic field are smaller far from the bushing. The electromagnetic field near grounding enclosure is measured
and the measured results basically coincide with the calculation results.
Measurement Method and System for Transient Platform Potential Rise and Electromagnetic Disturbance of Ultra-high Voltage Series Compensation Device
Numerical Calculation on Very Fast Transient Overvoltage of UHV Gas Insulated Substation by Variable Gap Arc Model
Measurement of Vibration Characteristics of Power Cable Line Under Typical Laying Conditions
Analysis on Electromagnetic Compatibility Immunity Requirements for Secondary Equipment During Switching Transient Operations in Intelligent Substation
Related Author
WEN Xishan
LIU Chenlei
LI Wei
PAN Zhuohong
CAI Hansheng
HU Shangmao
MA Qiyan
CUI Xiang
Related Institution
China Southern Power Grid Electric Power Research Institute
School of Electrical Engineering, Wuhan University
EPRI Science and Technology Co. Ltd.
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University