Discharge Process Analysis and Discharge Time Setting Method of Modular Multilevel Converter Based HVDC After Shutdown
|更新时间:2025-12-08
|
Discharge Process Analysis and Discharge Time Setting Method of Modular Multilevel Converter Based HVDC After Shutdown
Vol. 43, Issue 4, Pages: 1137-1143(2017)
作者机构:
国网福建省电力有限公司电力科学研究院
作者简介:
基金信息:
DOI:
CLC:
Published Online:10 April 2017,
Published:2017
稿件说明:
移动端阅览
LI Chao, TANG Zhijun, GUO Jiansheng, et al. Discharge Process Analysis and Discharge Time Setting Method of Modular Multilevel Converter Based HVDC After Shutdown[J]. 2017, 43(4): 1137-1143.
DOI:
LI Chao, TANG Zhijun, GUO Jiansheng, et al. Discharge Process Analysis and Discharge Time Setting Method of Modular Multilevel Converter Based HVDC After Shutdown[J]. 2017, 43(4): 1137-1143.DOI:
Discharge Process Analysis and Discharge Time Setting Method of Modular Multilevel Converter Based HVDC After Shutdown
The DC bus and sub-module should be fully discharged to ensure that the voltage is below the safety threshold after the shutdown process of modular multilevel converter based on HVDC(MMC-HVDC). In view of the limited research on the discharge process
we established a simulation model of MMC-HVDC flexible transmission project in China during the discharge process
and analyzed the discharge characteristics. The mathematical description formula of discharge time and residual voltage was deduced based on the discharge simulation model
and the setting method of discharge time was also proposed. Finally
a designed example was given and the verification tests were conducted at Xiamen HVDC flexible project. The results show that the simulation results are nearly identical to the experimental data
which indicates that the DC bus discharges via the equivalent grounding resistance of potential transformer; and the discharge process of sub-module can be divided into two cases according to different working states of the energy-absorbing source: the capacitor discharges via the control circuit and shunt resistance when the source is working
and the capacitor discharges only by the shunt resistance when the source is turned off. The discharge time setting method has been applied to Xiamen HVDC flexible project
which has ensured the fully discharge of the DC bus and sub-module
thus further confirms the validity of the designed setting method of discharge time.
Control Strategies of MMC-HVDC in the Absence of PLL Under Unbalanced Grid
Fast Simulation Method for Improved Topologies of Modular Multilevel Converter with DC Fault Current Blocking Capability
Control Strategy of Power Transfer in Bipolar HVDC Flexible Transmission System
基于投入窗口识别与分层算法的MMC子模块电容状态监测方法
Optimization Control of Sub-module Capacitor Voltage Balance for Modular Multilevel Converter Based on the Capacitor Voltage Estimation and Segmented Design
Related Author
LI Yunfeng
AN Ting
DING Xiao
LI Chen
YIN Xiaodong
HAO Quanrui
LI Zheng
WANG Shuying
Related Institution
China Electric Power Research Institute
State Grid Smart Grid Research Institute
State Grid Nanyang Electric Power Company
Department of Electrical Engineering, Shandong University
Jinan Power Supply Company, State Grid Shandong Electric Power Corporation