您当前的位置:
首页 >
文章列表页 >
Electrical Requirements for Ground Wire Insulator and Parallel Discharge Clearance During Insulation Reconstruction for OPGW DC De-icing
更新时间:2025-12-08
    • Electrical Requirements for Ground Wire Insulator and Parallel Discharge Clearance During Insulation Reconstruction for OPGW DC De-icing

    • Vol. 43, Issue 8, Pages: 2733-2738(2017)
    • Published Online:31 August 2017,

      Published:2017

    移动端阅览

  • CHEN Xiujuan, XIA Chao, ZHU Haiyu, et al. Electrical Requirements for Ground Wire Insulator and Parallel Discharge Clearance During Insulation Reconstruction for OPGW DC De-icing[J]. 2017, 43(8): 2733-2738. DOI:

  •  
  •  

0

Views

0

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Formation and Propagation Characteristics of Light Polarization Signal in OPGW Under Lightning Condition
Microscopic Detection and Mechanic Analysis for Broken Strands of Optical Fiber Composite Overhead Ground Wires

Related Author

CHENG Yuan
LI Tao
SHI Lei
YANG Yuan
SHEN Ping
GUO Tao
WANG Feng2
LIU Kai1

Related Institution

Transmission Operation Maintenance Branch, Guizhou Power Grid Linited Liability Corporation
Wuhan NARI Limited Liability Company, State Grid Electric Power Research Institute
Wuhan High Voltage Research Institute
Construction and operation Department of State Grid Corporation of China
  武汉高压研究所 武汉430074  
0