您当前的位置:
首页 >
文章列表页 >
Internal Overvoltage and Insulation Coordination of Electrode Line in HVDC Project
更新时间:2025-12-08
    • Internal Overvoltage and Insulation Coordination of Electrode Line in HVDC Project

    • Vol. 44, Issue 7, Pages: 2331-2337(2018)
    • Published Online:30 July 2018,

      Published:2018

    移动端阅览

  • XIE Shijun, SU Shaochun, HE Huiwen, et al. Internal Overvoltage and Insulation Coordination of Electrode Line in HVDC Project[J]. 2018, 44(7): 2331-2337. DOI:

  •  
  •  

0

Views

0

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

不同接地方式下的电缆序阻抗参数计算与分析
Calculation Method of Lightning Trip-out Rate of Transmission Line Under Jet Stream Arc-extinguishing Condition
Application of Reverse Recovery Characteristics in High Power Thyristor Testing
Study on Transient Current of the Key Equipment in Flexible DC Power Distribution System
Correlations Between Carrier Lifetime and Reverse Recovery Characteristics of High Power Thyristors

Related Author

JIANG Kaihua
WANG Shaohua
LI Te
CAO Junping
YANG Yong
YE Haoliang
WANG Jufeng
LIU Jinlian

Related Institution

国网浙江省电力有限公司电力科学研究院
College of Electrical Engineering, Guangxi University
College of Mechanical and Electrical Engineering, Wuyi University
State Key Laboratory of Electrical Insulation and Power Equipment, Xi’an Jiaotong University
China Electric Power Research Institute
0