Method of On-site Tests for the Withstand Voltage of Ultra-high-voltage GIS Lightning Impulse
|更新时间:2025-12-08
|
Method of On-site Tests for the Withstand Voltage of Ultra-high-voltage GIS Lightning Impulse
Vol. 44, Issue 12, Pages: 3936-3943(2018)
作者机构:
1. 国网江苏省电力有限公司电力科学研究院
2. 西安交通大学电力设备电气绝缘国家重点实验室
3. 国网辽宁省电力有限公司电力科学研究院
作者简介:
基金信息:
DOI:
CLC:
Published Online:31 December 2018,
Published:2018
稿件说明:
移动端阅览
TAO Fengbo, WANG Shuai, JIA Yongyong, et al. Method of On-site Tests for the Withstand Voltage of Ultra-high-voltage GIS Lightning Impulse[J]. 2018, 44(12): 3936-3943.
DOI:
TAO Fengbo, WANG Shuai, JIA Yongyong, et al. Method of On-site Tests for the Withstand Voltage of Ultra-high-voltage GIS Lightning Impulse[J]. 2018, 44(12): 3936-3943.DOI:
Method of On-site Tests for the Withstand Voltage of Ultra-high-voltage GIS Lightning Impulse
On-site tests for the withstand voltage of lightning impulse of gas-insulated metal-enclosed switchgear(GIS)
which can effectively detect concentrative defects
has become an important part of GIS on-site withstand voltage tests. Therefore
we developed a model for the system of testing the withstand voltage of ultra-high-voltage GIS on-site lightning impulse by the ATP-EMTP transient analysis software based on the 1 100 kV GIS on-site withstand voltage test project of 1 000 kV Nanjing Ultra-high-voltage Substation. Moreover
we investigated the influences of test schemes selection method and the test conditions on the voltage waveform. The results show that the standard lightning impulse voltage waveform can be generated by regulating the wavefront resistance when the load capacitance is smaller than 7 000 pF; however
when the load capacitance is greater than 7 000 pF
the standard lightning impulse cannot be obtained. If the single-circuit-breaker connecting mode is adopted
we can get a higher waveform quality
but the efficiency is relatively lower. If the multi-circuit-breaker connecting mode is adopted
higher efficiency can be acquired at the expense of waveform quality. The introduction of external voltage divider will slightly decrease the voltage amplitude and make the wave-front time longer. As the length of high voltage wire between bushing increases
the wave-front time is slightly shortened
and simultaneously causes the oscillation of load voltage waveform. Thus