Optimization of Deployment with Control for Battery Energy Storage System Participating in Primary Frequency Regulation Service Considering Its Calendar Life
|更新时间:2025-12-08
|
Optimization of Deployment with Control for Battery Energy Storage System Participating in Primary Frequency Regulation Service Considering Its Calendar Life
Vol. 45, Issue 7, Pages: 2185-2193(2019)
作者机构:
1. 大连理工大学电气工程学院
2. 吉林电力交易中心有限公司
3. 大连海洋大学信息工程学院
作者简介:
基金信息:
DOI:
CLC:
Published Online:30 July 2019,
Published:2019
稿件说明:
移动端阅览
WEN Kerui, LI Weidong, HAN Song, et al. Optimization of Deployment with Control for Battery Energy Storage System Participating in Primary Frequency Regulation Service Considering Its Calendar Life[J]. 2019, 45(7): 2185-2193.
DOI:
WEN Kerui, LI Weidong, HAN Song, et al. Optimization of Deployment with Control for Battery Energy Storage System Participating in Primary Frequency Regulation Service Considering Its Calendar Life[J]. 2019, 45(7): 2185-2193.DOI:
Optimization of Deployment with Control for Battery Energy Storage System Participating in Primary Frequency Regulation Service Considering Its Calendar Life
For the investment and planning of battery energy storage system(BESS)
allocation effect deviation may be caused when fixed life or cycling life is used to roughly characterize battery performance degradation under ancillary service market of primary frequency regulation
and it is difficult to maximize net income. we proposed a strategy for operation and control of BESS
which integrated power requirements of frequency regulation and delicacy management about state of charge(SOC). A methodology for prediction of battery calendar life was presented from the perspective of capacity degradation. A coordination optimization model between configuration capacity and control parameters was built for BESS to realize the maximum net present value(NPV) of total life cycle. The results of numerical examples validate the feasibility and effectiveness of proposed model. According to the methodology of calendar life prediction
the battery life and net investment income can be evaluated more accurately and properly under the application background of primary frequency regulation. Relevant research can provide a theoretical basis in planning and operation for BESS to participate in primary frequency regulation service.