Establishment of Dynamic Physical Model of Three-terminal UHV DC Transmission Line
|更新时间:2025-12-08
|
Establishment of Dynamic Physical Model of Three-terminal UHV DC Transmission Line
Vol. 46, Issue 6, Pages: 2064-2071(2020)
作者机构:
1. 华中科技大学电气与电子工程学院强电磁工程与新技术国家重点实验室
2. 国网湖北检修公司
作者简介:
基金信息:
DOI:
CLC:
Published Online:30 June 2020,
Published:2020
稿件说明:
移动端阅览
ZHANG Fengge, WEN Minghao, LIU Tie, et al. Establishment of Dynamic Physical Model of Three-terminal UHV DC Transmission Line[J]. 2020, 46(6): 2064-2071.
DOI:
ZHANG Fengge, WEN Minghao, LIU Tie, et al. Establishment of Dynamic Physical Model of Three-terminal UHV DC Transmission Line[J]. 2020, 46(6): 2064-2071.DOI:
Establishment of Dynamic Physical Model of Three-terminal UHV DC Transmission Line
the world’s first UHV three-terminal hybrid HVDC project
will be completed and put into operation in two years. This project is to transmit the large capacity hydropower in Yunnan to Guangxi and Guangdong by adopting advanced DC transmission technology. To study all kinds of fault features of UHV remote overhead DC transmission lines as well as explore a new criterion for better DC protection
the zero-sequence resistance and inductance frequency characteristics of DC transmission lines were analyzed
and the simplified model of grounding electrode line of converter station was proposed.The DC line models of Kunbei-Liubei Line and Liubei-Longmen Line were also designed
and a complete set of dynamic physical model of distributed parameters with grounding pole was established. Tests showed that the model system met the design requirements
which was able to reflect the physical characteristics of prototype system accurately as well as carry out various types of short circuit experiments at different fault points