Development and Experimental Verification of Four-terminal DC Grid Physical Platform
|更新时间:2025-12-08
|
Development and Experimental Verification of Four-terminal DC Grid Physical Platform
Vol. 47, Issue 1, Pages: 178-186(2021)
作者机构:
1. 华北电力大学新能源电力系统国家重点实验室
2. 国网湖北省电力有限公司电力科学研究院
3. 国网湖北省电力有限公司
作者简介:
基金信息:
DOI:
CLC:
Published Online:30 January 2021,
Published:2021
稿件说明:
移动端阅览
YU Yongjie, DENG Weicheng, CHEN Kun, et al. Development and Experimental Verification of Four-terminal DC Grid Physical Platform[J]. 2021, 47(1): 178-186.
DOI:
YU Yongjie, DENG Weicheng, CHEN Kun, et al. Development and Experimental Verification of Four-terminal DC Grid Physical Platform[J]. 2021, 47(1): 178-186.DOI:
Development and Experimental Verification of Four-terminal DC Grid Physical Platform
In order to carry out experimental verification on the protection and fault clearance strategy based on DC grid
we develop a four-terminal DC grid physical platform according to the network structure of Zhangbei DC grid. The pseudo-bipolar connection at DC-side is adopted in the platform
and each bridge arm is cascaded through a full-bridge modular multiple converter(MMC) sub-module. In terms of controller structure
the physical platform includes 3-level control structures
such as upper computer
crate controller
and sub-module crate
communicating through the Ethernet and optical fiber
respectively. And all control algorithm is set in FPGA of crate controller
realizing packet sequencing voltage-sharing strategy of the capacitor of sub-modules(SMs) to simplify the control method and improve response speed of controller. The good performance of physical platform is verified by the experiments of normal operation and power step change. Finally
the experiment of fault clearing is carried out.The results show that the physical platform has the hardware ability to carry out the research of DC power grid protection and fault clearing
which can provide good hardware support for the follow-up research.