Method for Realizing DC Output of Wind Turbine Based on Diode Rectifier
|更新时间:2025-12-08
|
Method for Realizing DC Output of Wind Turbine Based on Diode Rectifier
Vol. 47, Issue 8, Pages: 2708-2720(2021)
作者机构:
1. 上海交通大学电子信息与电气工程学院
2. 新疆金风科技股份有限公司
3. 富士电机有限公司
作者简介:
基金信息:
DOI:
CLC:
Published Online:31 August 2021,
Published:2021
稿件说明:
移动端阅览
YANG Mingyang, YANG Zhiqian, CAI Xu, et al. Method for Realizing DC Output of Wind Turbine Based on Diode Rectifier[J]. 2021, 47(8): 2708-2720.
DOI:
YANG Mingyang, YANG Zhiqian, CAI Xu, et al. Method for Realizing DC Output of Wind Turbine Based on Diode Rectifier[J]. 2021, 47(8): 2708-2720.DOI:
Method for Realizing DC Output of Wind Turbine Based on Diode Rectifier
摘要
未来海上风电场有望采用大型直流风电机组进行组网以降低电缆成本和损耗。为此
提出一种以二极管整流器作为中压并网端口
且具备储能端口与取电端口的多端口风电变流器拓扑
用其实现海上大型风电机组的直流化
其中
储能与取电端口用于实现机组自启动。直流并网端口无LC滤波装置
当发生直流短路故障时
由于无须采用电容器
则避免了对短路点的放电电流冲击。针对该系统方案
结合变流器数学模型
给出了包括启动、发电和故障穿越的机组级控制策略。详细推导分析了变换器关键元件的边界运行条件
并提出其主电路参数优化设计方法。在PSCAD中构建8.0MW直流风电机组仿真模型
仿真结果表明:变流器的全工况运行参数基本满足边界运行条件
启动并网过程平稳且无明显冲击
变流器能在100 ms左右清除直流短路故障电流
保护功率元件
并实现故障穿越。最后
利用基于RT-LAB实时仿真器和F28335控制器的半实物仿真平台
进一步验证了变流器启动与运行控制策略的有效性。
Abstract
In the future
offshore wind farms are expected to use DC output wind turbines for networking to reduce cable costs and losses. For this reason
a multi-port wind power converter
used for realizing the DC output of large offshore wind turbines
is proposed. The converter uses a diode rectifier as a medium-voltage grid-connected port
and an energy storage port and a power-taking port for realizing the self-starting of the wind turbine. Without an LC filter on the output side
no capacitor will cause a discharge current impact on the short-circuit point when a DC short-circuit fault occurs. The control strategies including start-up
power generation
and fault ride-through are given. Moreover
based on the analysis of the boundary conditions of the key components
the parameter optimization method of its main circuit is proposed. An 8.0 MW DC output wind turbine model is constructed in PSCAD
the simulation results show that the converter operating parameters basically meet the boundary conditions
the startup process is smooth and there is no obvious impact. The converter can clear the DC short-circuit fault current in about 100 ms
protect the power components
and achieve fault ride-through. Finally
the hardware-in-the-loop simulation platform based on RT-LAB real-time simulator and F28335 controller is used to further verify the effectiveness of the converter startup and operation control strategy.
DC Pole-to-ground Fault Ride-through Strategy of Hybrid HVDC System Based on LCC and Hybrid MMC
Concentrated DC Energy Braking Device with Discharge Controllable Sub-module Topology and Its Control
Startup Strategy of Transmission System of Offshore Wind Farms Based on Hybrid DC Converter
Improved Capacitor Voltage Balancing Control Strategy for Modular Multilevel Converter With Arm Current Control
Related Author
LIU Chongru
BAI Junhui
PEI Jiannan
ZHAO Dongmei
FAN Zhihua
ZHANG Dongyin
XU Hanping
MIAO Shihong
Related Institution
华北电力大学电气与电子工程学院
State Key Laboratory of Advanced Electromagnetic Engineering and Technology,School of Electrical and Electronic Engineering,Huazhong University of Science and Technology
Economics & Technology Research Institute,State Grid Hubei Electric Power Company
NR Electric Co., Ltd.
Electric Power Research Institute of State Grid Shanghai Municipal Electric Power Company