您当前的位置:
首页 >
文章列表页 >
Reserved Capacity Planning of Fast Frequency Response Considering Risk Preference
更新时间:2025-12-08
    • Reserved Capacity Planning of Fast Frequency Response Considering Risk Preference

    • Vol. 47, Issue 10, Pages: 3475-3484(2021)
    • Published Online:31 October 2021,

      Published:2021

    移动端阅览

  • LI Zifeng, ZHANG Na, XU Xilin, et al. Reserved Capacity Planning of Fast Frequency Response Considering Risk Preference[J]. 2021, 47(10): 3475-3484. DOI:

  •  
  •  

0

Views

0

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Mechanism of Disturbance Impact Propagation in Ultra-high Voltage Power System Based on Energy Supply on Port
Transient Stability Available Capacity Fast Prediction of Power System Critical Cutset Based on Support Vector Machine
Dual-stage Method for Islanding Surface Searching Under Interconnected Power System
Dynamic Method for Solving Wind Power Penetration Limit Considering System Operation Risk
Fast Identification Method of Weak Transmission Section Considering the Influence of Power Network Changes

Related Author

CHEN Qian
WANG Zhiwen
SHEN Chen
TANG Lei
WANG Ke
YOU Dahai
LAN Haibo
LIU Haitao

Related Institution

State Key Laboratory of Control and Simulation of Power Systems and Generation Equipment,Department of Electrical Engineering, Tsinghua University
State Grid Wu Han Power Supply Company
Jibei Electric Power Company Limited
Shenzhen Power Supply Bureau Co. Ltd.
State Key Laboratory of Advanced Electromagnetic Engineering and Technology, Huazhong University of Science and Technology
0