曾光辉, 叶容慧, 刘伟斌, 黄永麟, 李家淇. 基于潮流计算的中压直流配电网协同优化调度[J]. 电网与清洁能源, 2024, 40(9): 98-104.
引用本文: 曾光辉, 叶容慧, 刘伟斌, 黄永麟, 李家淇. 基于潮流计算的中压直流配电网协同优化调度[J]. 电网与清洁能源, 2024, 40(9): 98-104.
ZENG Guanghui, YE Ronghui, LIU Weibin, HUANG Yonglin, LI Jiaqi. The Cooperative Optimal Dispatching of the Medium Voltage DC Distribution Network Based on Power Flow Calculation[J]. Power system and Clean Energy, 2024, 40(9): 98-104.
Citation: ZENG Guanghui, YE Ronghui, LIU Weibin, HUANG Yonglin, LI Jiaqi. The Cooperative Optimal Dispatching of the Medium Voltage DC Distribution Network Based on Power Flow Calculation[J]. Power system and Clean Energy, 2024, 40(9): 98-104.

基于潮流计算的中压直流配电网协同优化调度

The Cooperative Optimal Dispatching of the Medium Voltage DC Distribution Network Based on Power Flow Calculation

  • 摘要: 为保证中压直流配电网的运行稳定性,实现中压直流配电网协同优化调度,提出基于潮流计算的中压直流配电网协同优化调度方法。通过中压直流配电网潮流计算模型,分析该配电网中的潮流分布情况,确定采用均衡度指标描述网损结果;构建中压直流配电网在单个调度周期内的有功损耗和线路负载均衡目标函数,并设定潮流约束等多个约束条件;采用多目标粒子群优化算法求解目标函数,同时优化均衡度变量参数和整个网络,获取协同优化调度结果。测试结果显示:所提方法协同优化调度效果良好,电压标幺值的结果均低于1.00 pu,各节点在日运行时间内的电压波动变化也在期望标准范围内;网损结果均低于0.047 MW;可实现削峰填谷,避免电压发生越限。

     

    Abstract: To ensure the operation stability and realize the cooperative optimal scheduling of the medium voltage DC distribution network,a cooperative optimal scheduling method based on power flow calculation is proposed in this paper.Through the power flow calculation model of the network,the power flow distribution is analyzed,and the output equalization index is determined to describe the network loss result. An active loss and line load balance objective function of the network in a single operation cycle is constructed, and constraints such as multiple constraints conditions are set. The multi-objective particle swarm optimization algorithm is used to solve the objective function and the equilibrium degree of variable parameters and the entire network are optimized at the same time to obtain the collaborative optimization scheduling results. The test results show that the cooperative optimization scheduling effect of the proposed method is satisfactory,and the voltage per-unit values are all lower than 1.00p.u. The fluctuation of voltage is within the expected standard range in the intra-day operation of each node;and the network losses are all lower than 0.047MW. In addition,peak clipping and valley filling can be realized to avoid voltage exceeding the limit.

     

/