吴天曈, 丁一, 尚楠, 包铭磊, 宋永华. 考虑市场力检验的多类机组中长期合约电量联合分解算法[J]. 电力系统自动化, 2021, 45(6): 72-81.
引用本文: 吴天曈, 丁一, 尚楠, 包铭磊, 宋永华. 考虑市场力检验的多类机组中长期合约电量联合分解算法[J]. 电力系统自动化, 2021, 45(6): 72-81.
WU Tiantong, DING Yi, SHANG Nan, BAO Minglei, SONG Yonghua. Joint Decomposition Algorithm of Medium-and Long-term Contract for Variety of Generation Units Considering Market Power Test[J]. Automation of Electric Power Systems, 2021, 45(6): 72-81.
Citation: WU Tiantong, DING Yi, SHANG Nan, BAO Minglei, SONG Yonghua. Joint Decomposition Algorithm of Medium-and Long-term Contract for Variety of Generation Units Considering Market Power Test[J]. Automation of Electric Power Systems, 2021, 45(6): 72-81.

考虑市场力检验的多类机组中长期合约电量联合分解算法

Joint Decomposition Algorithm of Medium-and Long-term Contract for Variety of Generation Units Considering Market Power Test

  • 摘要: 中长期合约电量的分解是电力市场的关键环节之一,公平合理的分解算法不仅能有效衔接现货市场与中长期合约,也能够为系统安全、稳定、经济运行提供保障。当前出力特性各异的核电、水电、燃气等发电机组共同参与市场化交易,合约电量分解方法面临着差异化机组出力特性、机组检修计划、市场力风险平抑等诸多亟待研究的现实问题。文中提出了一种考虑市场力校核的面向不同类型发电机组的合约电量联合分解算法。首先,通过分析不同类型机组的运行特性,设计了面向核电、水电、燃气和燃煤机组的分解原则;然后,基于运行方式优先级原则,建立了考虑机组检修计划、兼顾发电侧多类机组出力特性的合约电量联合分解模型;最后,为避免机组的市场力滥用,借助"机组必须运行功率"指标校核了合约分解结果的合理性。通过采用中国东部某省负荷特征修正的IEEE 24节点系统,验证了所提算法在兼顾各类机组运行特性和市场力平抑方面具有优势。

     

    Abstract: The decomposition of medium-and long-term contract is one of the key links in the electricity market. A fair and reasonable decomposition algorithm can not only effectively connect the spot market and medium-and long-term contracts, but also provide the guarantee for the safe and stable economic operation of the power system. As the generation units such as nuclear,hydropower, gas with different output characteristics participate in market transactions jointly, the contract decomposition method is faced with many practical problems that need to be studied urgently such as output characteristics of differentiated units,maintenance scheduling and market power risk reduction. In this paper, a joint decomposition algorithm of contracts for different types of units considering market power test is proposed. First, by analyzing the operation characteristics of different types of units,the decomposition principles for nuclear, hydropower, gas and coal units are designed. Then, based on the principle of the priority of operation modes, a joint decomposition model of contract considering the maintenance scheduling of sets and output characteristics of various units on the generation side is established. Finally, in order to avoid the abuse of the market power of units, the rationality of the contract decomposition result is checked with the index of"must-run generation(MRG)". A case of modified IEEE 24-bus system with load characteristics of a province in east China shows that the proposed algorithm has advantages in adaption to operation characteristics of various units and suppression of market power.

     

/

返回文章
返回