Abstract:
In the multi-station integrated mode of the four stations in one, i. e.,“substation-new energy station-energy storage power station-data center”, leasing energy storage device from energy storage stations as uninterrupted power supply(UPS) is a new construction method that can adapt to the increasing trend of data center business demand year by year. A multi-station integrated operation mode is designed for the energy storage leased by data centers. By establishing a game model of energy storage leasing between data centers and multi-station integrated operators, the optimal energy storage leasing price and leasing capacity of multi-station integrated operators considering the leasing intention of data centers are obtained, as well as the optimal construction capacity of new energy equipment and energy storage equipment. An example is given to analyze the effect of variation of the energy storage leasing price on the decision-making schemes and revenues of multi-station integrated operators and data centers,and to verify the effectiveness of the proposed operation mode.